File #: 09-1790    Version: 1 Name: Deerfield Road Bike Path, Des Plaines River Trail to Thorn Meadow Road: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 7/28/2009 In control: Public Works and Transportation Committee
On agenda: Final action: 8/11/2009
Title: Joint resolution authorizing the execution of a contract for professional services for the design of the Deerfield Road Bike Path from the Des Plaines River Trail to Thorn Meadow Road at a maximum cost of services described of $154,343.14 and appropriates $185,000 of County Bridge Tax funds and designated as Section 04-00038-03-BT.
Attachments: 1. 1790 Deerfield AGRMT_20090730084921.pdf

Title

Joint resolution authorizing the execution of a contract for professional services for the design of the Deerfield Road Bike Path from the Des Plaines River Trail to Thorn Meadow Road at a maximum cost of services described of $154,343.14 and appropriates $185,000 of County Bridge Tax funds and designated as Section 04-00038-03-BT. 

Staff Summary

                     Deerfield Road Bike Path, Des Plaines River Trail to Thorn Meadow Road: Consultant Agreement and Appropriation

                     This is a Phase II engineering contract for this bike path including a boardwalk and bridge. 

                     This resolution authorizes the execution of a professional services agreement with Christopher B. Burke Engineering, Ltd., Rosemont, Illinois, for Phase II engineering services and appropriates $185,000 of County Bridge Tax funds.

Body

 

                     WHEREAS, Deerfield Road (County Highway 11) is a designated route on the county highway system; and

 

                     WHEREAS, it would be beneficial to the safety and welfare of the motoring public if a bike path and bridge to provide access to the Des Plaines River Trail could be constructed along Deerfield Road at the Des Plaines River Bridge; and

 

                     WHEREAS, it is advisable that a consulting engineering firm be employed to provide Phase II engineering services (Design Engineering); and

 

                     WHEREAS, Lake County by and through its Division of Transportation has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act (50 ILCS 510/1 et. seq.); and  

 

                     WHEREAS, Christopher B. Burke Engineering Ltd., Rosemont, Illinois, are consulting engineers skilled in the provision of said Phase II engineering services (Design Engineering).

 

                     NOW, THEREFORE BE IT RESOLVED BY this County Board of Lake County, Illinois, that Christopher B. Burke Engineering Ltd., Rosemont, Illinois, be employed to provide said Phase II engineering services (Design Engineering), and that the Chair of the County Board, the County Clerk and the County Engineer of Lake County are authorized and they are directed to execute, on behalf of Lake County, an agreement for consultant engineering services between Lake County and Christopher B. Burke Engineering Ltd., Rosemont, Illinois, providing in the opinion of the Public Work and Transportation Committee, if necessary, said agreement in its final form substantially conforms to the draft attached hereto. The County Engineer shall transmit in writing the final agreement to be executed by the Chair of the Lake County Board and the County Clerk.  

 

                     BE IT FURTHER RESOLVED that there is hereby appropriated $185,000 of County Bridge Tax funds for these engineering services designated as Section 04-00038-03-BT.

 

                     BE IT FURTHER RESOLVED that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further Board action providing the final contract cost chargeable under the funds appropriated herein does not exceed the appropriation aforesaid.

 

Dated at Waukegan, Illinois, on this 11th day of August A.D., 2009