File #: 17-1241    Version: 1 Name: Wadsworth Road at Dilleys Road, and Wadsworth Road at Kilbourne Road, Phase II: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 10/31/2017 In control: Public Works and Transportation Committee
On agenda: Final action: 11/14/2017
Title: Joint resolution authorizing an agreement with Christopher B. Burke Engineering Ltd., Rosemont, Illinois, for Phase II design engineering for the intersection improvements of Wadsworth Road at Dilleys Road, and Wadsworth Road at Kilbourne Road, at a maximum cost of $357,756.52, appropriating $430,000 of 1/4% Sales Tax for Transportation funds, and designated as Section 17-00999-47-EG.
Attachments: 1. 17-1241 Wadsworth Road Improvement Phase II Agreement Draft.pdf
Title
Joint resolution authorizing an agreement with Christopher B. Burke Engineering Ltd., Rosemont, Illinois, for Phase II design engineering for the intersection improvements of Wadsworth Road at Dilleys Road, and Wadsworth Road at Kilbourne Road, at a maximum cost of $357,756.52, appropriating $430,000 of 1/4% Sales Tax for Transportation funds, and designated as Section 17-00999-47-EG.

Staff Summary
* Wadsworth Road at Dilleys Road, and Wadsworth Road at Kilbourne Road, Phase II: Consultant Agreement and Appropriation.
* Wadsworth Road at Dilleys Road, and Wadsworth Road at Kilbourne Road, need to be widened and reconstructed.
* Consultant engineering services will be utilized to complete the Phase II design engineering.
* Using the Local Government Professional Services Selection Act, the selected, and recommended, consultant is Christopher B. Burke Engineering Ltd., Rosemont, Illinois, at a maximum cost of $357,756.52.

Body
R E S O L U T I O N

WHEREAS, it would be beneficial for the safety and welfare of the motoring public if the intersections of Wadsworth Road at Dilleys Road, and Wadsworth Road at Kilbourne Road, could be improved by widening and reconstruction; and

WHEREAS, it is recommended that a consultant engineering firm be employed to provide Phase II design engineering services for said proposed widening and reconstruction; and

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act (50 ILCS 510/1 et. seq.); and

WHEREAS, Christopher B. Burke Engineering Ltd., Rosemont, Illinois, are consultant engineers skilled in the provision of said Phase I preliminary engineering services.

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that Christopher B. Burke Engineering Ltd., Rosemont, Illinois, be employed to provide said Phase II design engineering services for a maximum cost of $357,756.52, ...