Title
Joint resolution appropriating $1,110,000 of Matching Tax funds for the repair and stabilization of an existing sheet piling wall adjacent to the multi-use path on the north side of Grass Lake Road, and designated as Section 16-00059-11-BR.
Staff Summary
• Grass Lake Road 2018 Retaining Wall Maintenance: Construction Appropriation.
• This improvement is included in the Highway Improvement Program.
• Before a project letting can be held, an appropriation of $1,110,000 of Matching Tax Funds is necessary.
Body
R E S O L U T I O N
WHEREAS, Grass Lake Road, County Highway 18, is a designated route on the County highway system; and
WHEREAS, there is a retaining wall on the north side of Grass Lake Road that is in poor condition and needs repair; and
WHEREAS, plans, specifications and estimates of costs for this improvement have been completed, and this improvement is now ready to proceed to a contract letting; and
WHEREAS, before a construction letting can be held, an appropriation of funds is needed.
NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that there is hereby appropriated $1,110,000 of Matching Tax funds for the repair and stabilization of an existing sheet piling wall adjacent to the multi-use path on the north side of Grass Lake Road, and designated as Section 16-00059-11-BR.
DATED at Waukegan, Illinois, on November 14. 2017.