File #: 17-1232    Version: 1 Name: Grass Lake Road 2018 Retaining Wall Maintenance: Construction Appropriation
Type: resolution Status: Passed
File created: 10/31/2017 In control: Public Works and Transportation Committee
On agenda: Final action: 11/14/2017
Title: Joint resolution appropriating $1,110,000 of Matching Tax funds for the repair and stabilization of an existing sheet piling wall adjacent to the multi-use path on the north side of Grass Lake Road, and designated as Section 16-00059-11-BR.

Title

Joint resolution appropriating $1,110,000 of Matching Tax funds for the repair and stabilization of an existing sheet piling wall adjacent to the multi-use path on the north side of Grass Lake Road, and designated as Section 16-00059-11-BR.

 

Staff Summary

                     Grass Lake Road 2018 Retaining Wall Maintenance: Construction Appropriation.

                     This improvement is included in the Highway Improvement Program.

                     Before a project letting can be held, an appropriation of $1,110,000 of Matching Tax Funds is necessary.

 

Body

R E S O L U T I O N

 

WHEREAS, Grass Lake Road, County Highway 18, is a designated route on the County highway system; and

 

WHEREAS, there is a retaining wall on the north side of Grass Lake Road that is in poor condition and needs repair; and

 

WHEREAS, plans, specifications and estimates of costs for this improvement have been completed, and this improvement is now ready to proceed to a contract letting; and

 

WHEREAS, before a construction letting can be held, an appropriation of funds is needed.

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that there is hereby appropriated $1,110,000 of Matching Tax funds for the repair and stabilization of an existing sheet piling wall adjacent to the multi-use path on the north side of Grass Lake Road, and designated as Section 16-00059-11-BR. 

 

DATED at Waukegan, Illinois, on November 14. 2017.